initial commit

This commit is contained in:
2026-03-16 19:54:53 -04:00
commit bfe0e01254
3341 changed files with 483939 additions and 0 deletions

View File

@@ -0,0 +1,59 @@
# Design Log
**Project:** {{project_name}}
**Started:** {{date}}
**Method:** Whiteport Design Studio (WDS)
---
## Backlog
> Business-value items. Add links to detail files if needed.
- [ ] Complete product brief — Phase 1
- [ ] Define trigger map — Phase 2
- [ ] Create user scenarios — Phase 3
---
## Current
| Task | Started | Agent |
|------|---------|-------|
| — | — | — |
**Rules:** Mark what you start. Complete it when done (move to Log). One task at a time per agent.
---
## Design Loop Status
> Per-page design progress. Updated by agents at every design transition.
| Scenario | Step | Page | Status | Updated |
|----------|------|------|--------|---------|
**Status values:** `discussed``wireframed``specified``explored``building``built``approved` | `removed`
**How to use:**
- **Append a row** when a page reaches a new status (do not overwrite — latest row per page is current status)
- **Read on startup** to see where the project stands and what to suggest next
---
## Log
### {{date}} — Project initialized (Phase 0)
- Type: {{greenfield/brownfield}}
- Complexity: {{product_complexity}}
- Tech stack: {{tech_stack}}
---
## About This Folder
- **This file** — Single source of truth for project progress
- **agent-experiences/** — Compressed insights from design discussions (dated files)
- **wds-project-outline.yaml** — Project configuration from Phase 0 setup
**Do not modify `wds-project-outline.yaml`** — it is the source of truth for project configuration.