initial commit
This commit is contained in:
105
_bmad/wds/workflows/0-project-setup/workflow.md
Normal file
105
_bmad/wds/workflows/0-project-setup/workflow.md
Normal file
@@ -0,0 +1,105 @@
|
||||
---
|
||||
name: project-setup
|
||||
description: Project onboarding - determine project type, complexity, tech stack, and route to correct phase
|
||||
web_bundle: true
|
||||
---
|
||||
|
||||
# Phase 0: Project Setup
|
||||
|
||||
**The starting point for every WDS project.**
|
||||
|
||||
|
||||
## Purpose
|
||||
|
||||
Phase 0 ensures you start on the right path. Before diving into design work, we need to understand:
|
||||
|
||||
1. **What is WDS?** - So you know what you're getting
|
||||
2. **What type of project?** - New product vs existing product
|
||||
3. **How complex?** - Landing page vs web application
|
||||
4. **What tech?** - Framework and component library choices
|
||||
5. **What's the right workflow?** - Route to the correct phase with right config
|
||||
|
||||
---
|
||||
|
||||
## Why This Matters
|
||||
|
||||
**The #1 mistake**: Starting Phase 1 with an existing codebase.
|
||||
|
||||
- **Phase 1-7** = Building something NEW (Greenfield)
|
||||
- **Phase 8** = Improving something EXISTING (Brownfield, Product Evolution)
|
||||
|
||||
Wrong path = wasted work. Phase 0 prevents this.
|
||||
|
||||
---
|
||||
|
||||
## The Flow
|
||||
|
||||
```
|
||||
Phase 0: Project Setup
|
||||
│
|
||||
├─→ Step 01: Welcome
|
||||
│ ├─→ "What is WDS?" (quick intro)
|
||||
│ └─→ "Greenfield or Brownfield?"
|
||||
│
|
||||
└─→ Step 02: Configuration
|
||||
├─→ Project name
|
||||
├─→ Product complexity (landing/website/app)
|
||||
├─→ Tech stack (optional)
|
||||
├─→ Component library (optional)
|
||||
├─→ Brief level (complete/simplified)
|
||||
├─→ Strategic analysis (full/simplified/skip)
|
||||
├─→ Create folder structure
|
||||
└─→ Generate project outline
|
||||
│
|
||||
├─→ Greenfield → Phase 1 (→ Phase 2 if full analysis)
|
||||
└─→ Brownfield → Phase 8
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
## Steps
|
||||
|
||||
| Step | Name | Purpose |
|
||||
|------|------|---------|
|
||||
| 01 | [Welcome & Orientation](steps/step-01-welcome.md) | Introduce WDS, determine greenfield vs brownfield |
|
||||
| 02 | [Configuration & Structure](steps/step-02-structure.md) | Configure project, create folders, generate outline |
|
||||
|
||||
---
|
||||
|
||||
## Entry Point
|
||||
|
||||
**Start here**: `steps/step-01-welcome.md`
|
||||
|
||||
---
|
||||
|
||||
## When to Use Phase 0
|
||||
|
||||
- First time using WDS
|
||||
- Starting a new project
|
||||
- Joining an existing project
|
||||
- Unsure which workflow to use
|
||||
|
||||
---
|
||||
|
||||
## When to Skip Phase 0
|
||||
|
||||
- Project outline already exists (`.wds-project-outline.yaml`)
|
||||
- You know exactly which phase you need
|
||||
- Continuing work on established WDS project
|
||||
|
||||
---
|
||||
|
||||
**Phase 0 takes 3-5 minutes. It saves hours of wrong-path work.**
|
||||
|
||||
---
|
||||
|
||||
## Configuration Options
|
||||
|
||||
| Option | Values | Impact |
|
||||
|--------|--------|--------|
|
||||
| Project Type | greenfield / brownfield | Determines Phase 1-7 (greenfield) vs Phase 8 (brownfield) |
|
||||
| Complexity | simple / standard / complex | Which phases are enabled |
|
||||
| Tech Stack | react / vue / wordpress / etc. | Delivery format guidance |
|
||||
| Component Library | shadcn / tailwind / custom | Skip or enable Phase 5 |
|
||||
| Brief Level | complete / simplified | Depth of Phase 1 |
|
||||
| Strategic Analysis | full / simplified / skip | Full Trigger Map or simplified in brief |
|
||||
Reference in New Issue
Block a user