# Execution Principles
|
||||
|
||||
## Document Before Acting
|
||||
|
||||
**Every decision, action, and problem must be documented in the dialog file BEFORE acting on it.**
|
||||
|
||||
This ensures full traceability, clean handoff, and the dialog document is always the source of truth.
|
||||
|
||||
## Sketch Fidelity
|
||||
|
||||
**Implement code as close to the provided sketches as possible.**
|
||||
|
||||
Sketches are intentional design decisions, not loose suggestions:
|
||||
|
||||
| Element | Approach |
|
||||
|---------|----------|
|
||||
| **Text sizes** | Match relative sizes (headings vs body vs labels) |
|
||||
| **Proportions** | Preserve ratios between elements |
|
||||
| **Spacing** | Maintain visual rhythm and whitespace |
|
||||
| **Layout** | Follow the arrangement precisely |
|
||||
| **Component style** | Match the visual pattern (pills, cards, buttons) |
|
||||
|
||||
When in doubt: ask the designer. If constraints make exact matching impossible, document the deviation and explain why.
|
||||
|
||||
## Sub-Steps During Execution
|
||||
|
||||
While working on a step, add discovered tasks as sub-steps:
|
||||
|
||||
```markdown
|
||||
| # | Section | Status | Notes |
|
||||
|---|---------|--------|-------|
|
||||
| 14 | Book It Button | Done | Complete |
|
||||
| 14a | Fix button alignment | Done | Added during 14 |
|
||||
| 14b | Add loading state | Done | Added during 14 |
|
||||
| 15 | Cancel Button | In Progress | |
|
||||
```
|
||||
|
||||
Sub-steps use letter suffixes (14a, 14b) to maintain parent position.
|
||||
|
||||
## Dynamic Planning After Step Completion
|
||||
|
||||
After completing each step, review and adjust the plan:
|
||||
|
||||
1. Review remaining steps — still accurate?
|
||||
2. Shuffle if needed — reorder based on learnings
|
||||
3. Add new steps — if implementation revealed new requirements
|
||||
4. Remove steps — if no longer needed
|
||||
5. Update the dialog file
|
||||
|
||||
**Numbering rules:** Completed steps = fixed numbering. Future steps = dynamic numbering.
|
||||
|
||||
## Plan-then-Execute Pattern
|
||||
|
||||
**Separate planning from execution into distinct sessions.**
|
||||
|
||||
Context windows are finite. Long sessions accumulate noise. The solution:
|
||||
|
||||
**Planning Session:**
|
||||
1. Explore codebase and requirements
|
||||
2. Discuss approach with designer
|
||||
3. Write plan to dialog file
|
||||
4. End with clear handoff
|
||||
|
||||
**Execution Session:**
|
||||
1. Start fresh (new conversation)
|
||||
2. Read product brief for context
|
||||
3. Read page specification for requirements
|
||||
4. Read dialog document for plan and progress
|
||||
5. Execute steps one by one
|
||||
|
||||
**When to split:** After complex exploration, when plan is complete, when session is getting long, before major implementation.
|
||||
|
||||
## Handoff Always References Dialog
|
||||
|
||||
Any handoff — to a new session, agent, or human — **MUST** reference the dialog document. Never hand off verbally. Always point to the dialog.
|
||||