Files
bi-agents/_bmad/wds/workflows/5-agentic-development/workflow-acceptance-testing.md
Cassel 647cbec54f docs: update all documentation and add AI tooling configs
- Rewrite README.md with current architecture, features and stack
- Update docs/API.md with all current endpoints (corporate, BI, client 360)
- Update docs/ARCHITECTURE.md with cache, modular queries, services, ETL
- Update docs/GUIA-USUARIO.md for all roles (admin, corporate, agente)
- Add docs/INDEX.md documentation index
- Add PROJETO.md comprehensive project reference
- Add BI-CCC-Implementation-Guide.md
- Include AI agent configs (.claude, .agents, .gemini, _bmad)
- Add netbird VPN configuration
- Add status report

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-19 13:29:03 -04:00

1.8 KiB

name, description
name description
acceptance-testing Design and run acceptance tests from specification criteria

[T] Acceptance Testing — Design & Run Tests from Spec Criteria

Goal: Validate that implementation matches design specifications through structured testing.

When to use: Implementation is complete (prototype or production), ready for validation against specs.


INITIALIZATION

Design Log

Read {output_folder}/_progress/00-design-log.md. Check Current and Backlog for context.


STEPS

Execute steps in ./steps-t/:

Step File Purpose
01 step-01-prepare.md Gather materials, set up environment
02 step-02-execute.md Run all test categories
03 step-03-document-issues.md Create issue tickets
04 step-04-report.md Compile test report
05 step-05-iterate.md Iterate fixes or approve

Reference data:

  • ./data/testing-guide.md
  • ./data/test-result-templates.md
  • ./data/issue-templates.md

DESIGN LOG REPORTING POINT

When all tests pass and the user approves, append to the Design Loop Status table in {output_folder}/_progress/00-design-log.md:

| [Scenario slug] | [NN.X] | [Page name] | approved | [YYYY-MM-DD] |

Do NOT skip this. The design log drives Phase 4's adaptive dashboard.

AFTER COMPLETION

If all tests pass:

Design log updated with approved status (see above). Present the transition:

**"[page name]" is approved!**
  1. Explore the next scenario step — [next page name]
  2. Design delivery — package for development handoff (Phase 4 [H])

If issues found:

Status stays built. Present:

**"[page name]" has [N] issues to fix.**
  1. Fix the issues — route to bugfixing
  2. Explore the next scenario step — fix later, continue designing